Case study · Insurance operations

Property and casualty claims intake

Company-reported case study

Actigy BPO handled first notice of loss (FNOL) intake for Summit P&C Administrators. The company reports 41 minutes versus 4.1 minutes from intake start to completion over six months; adjusters retained claim decisions.

Actigy BPO confirms the engagement and supporting records. Results apply to the stated scope and measurement windows.

Intake turnaround

Result

4.1 min

Baseline: 41 min

Window: 6 months

Supporting record: Claims system report

Claims leakage

Result

0.3%

Baseline: 5.6%

Window: 6 months

Supporting record: Audit record

Adjuster data-entry time

Result

3 hours / week

Baseline: 18 hours / week

Window: 6 months

Supporting record: Timesheet

Client profile

Summit P&C Administrators, a US insurance third-party administrator with 320 staff.

Challenge and scope

Adjusters spend time entering data and organizing intake instead of investigating claims. The starting leakage rate is 5.6%.

An adjuster receiving a first notice of loss often needs to identify the carrier, policy, date of loss, and immediate action before investigation can begin. Missing fields or a wrong assignment increase follow-up. Intake work needs enough context for the adjuster to start from the initial record.

Delivery workflow

Capture and validate first reports, prepare evidence, and route claims to the right adjuster. The engagement covers 7,800 monthly claims across 14 carriers and four lines of business.

Capture the report in the approved claims system and check the minimum fields for the relevant carrier and line. Attach available documents, flag potential duplicate reports, and route time-sensitive or incomplete cases to the designated adjuster. Include the current status and the next action in the handoff.

Log why a report was assigned, redirected, or returned. Review samples of both routine and escalated claims against the carrier’s intake checklist. Where the first report is incomplete, record who should get the missing evidence and when the claim needs another review.

Delivery team

Poland, about 18 FTE. 1 claims lead, 3 intake specialists and 14 claims associates.

Systems and tools

Guidewire, client TPA platform.

Client decision rights

The client controls coverage decisions, reserves, and settlement authority.

Early milestone

The week 4 record shows a 14-minute intake turnaround.

Outcomes

Company-reported results, with the baseline, measurement window and supporting record described for each measure.

Reported results: Property and casualty claims intake
MeasureBaselineResultWindowSupporting record
Intake turnaround41 min4.1 min6 monthsClaims system report
Claims leakage5.6%0.3%6 monthsAudit record
Adjuster data-entry time18 hours / week3 hours / week6 monthsTimesheet
Intake accuracy93.2%99.6%6 monthsQA review sample

Interpreting the results

The intake time falls from 41 to 4.1 minutes while accuracy rises from 93.2% to 99.6%. Check whether the endpoint is a completed intake record or a ready-to-investigate handoff. Review leakage against the carrier’s definition and claim cohort, and measure adjuster data-entry time independently.

Recommendations for new clients

For administrators with an intake backlog, establish the start and stop timestamps and define leakage by claim cohort. Audit intake accuracy separately from later coverage and settlement decisions.

Begin with carriers and claims types that have clear intake instructions. Include after-hours, incomplete, and duplicate-like reports in a test sample. Ask adjusters to assess whether the intake packet lets them start investigation, and confirm how suspected coverage or settlement questions reach the carrier.

Scope this workflow for your operation

Use the documented workflow, client-held decisions and operational checks to outline a pilot for your own workload.