Truck loading delay log for US freight operations
Actigy BPO coordinates freight loading remotely for US trucking and warehouse teams. Use this log to record the appointment, actual arrival, loading start and release, with a source and time zone for each event. The facility confirms loading events. The authorized client decides charges.
Free to use · No email required · Calculations stay in your browser
Make the assumptions visible
Separate waiting at the dock from time spent loading
Start with the fictional example or enter your own planning assumptions. Use the Excel download for a multi-row record.
Check the initial worked example
A carrier reports arrival at 07:30, the dock confirms loading started at 08:20 and the facility records release at 09:35, all at UTC−05:00. That is 50 minutes before loading and 75 minutes from loading start to release. The time log alone does not make any interval billable.
A repeatable method
How to use the worksheet
For US carriers, shippers, brokers and 3PL teams coordinating an assigned load across dispatch, the dock and billing.
Download the editable workbookStart with a facility reference, appointment window and local time zone. Record a dispatch ETA as an estimate and a facility appointment as a confirmed booking.
Record actual check-in, dock start and release separately. Use the event source and time zone. Mark unknown times as missing.
At shift change, name the next owner and required update. If finance needs to review detention, send the record and the applicable agreement through its approved channel.
Illustrative · Not a client result
A second worked example
A truck checks in at 08:10, loading starts at 08:55 and the facility reports release at 10:05 in the same time zone. The record shows 45 minutes before loading and 70 minutes from start to release. It does not establish how many minutes the customer owes.
Keep the decision with its owner
What this tool can establish
Elapsed time is not automatically billable detention or driver pay. Contract terms, appointment rules, incomplete evidence and facility events affect review. Physical loading, securement and site safety stay with the authorized on-site teams.
Check the method
Sources and reuse
The examples and calculations are original Actigy BPO material. These sources explain the underlying workflow.
- FMCSA: driver detention times in commercial motor vehicle operations
- US GAO: loading and unloading wait times
Suggested citation: Actigy BPO, Truck loading delay log for US freight operations. Link to this page so readers can check the method and download the current version.